Exsim Development
Nouvelle Industrial Park
Structure Reinforced concrete
Wall Brick wall with cement plastering
Roof Metal deck roofing
Ceiling Asbestos-free flat ceiling / skim coat
Floor Finishes
Ground Floor Toilet – ceramic tiles
Others – cement render
First Floor Toilet – ceramic tiles
Others – cement render
Second Floor Toilet – ceramic tiles
Others – cement render
Wall Finishes Toilet – glazed tiles at 1,524mm (5´0´) Ht
  Others – generally plastered & painted
Painting Exterior Walls – weather resistant paint
Interior Walls – emulsion paint
Windows Aluminium frame window
Aluminium frame fixed louvers
Door M.S. frame plywood flush door
M.S. roller shutter
Staircase Ceramic tiles
Sanitary Fittings
Ground Floor Wash basin – 1 No.
Sitting W.C. – 2 Nos.
First Floor Wash basin – 1 No.
Sitting W.C. – 2 Nos.
Second Floor Wash basin – 1 No.
Sitting W.C. – 2 Nos.
Electrical Fittings Ceiling lighting point – 29 Nos.
Wall lighting point – 5 Nos.
Power point – 15 Nos.
Phone point – 5 Nos.
A/C point – 2 Nos.