Exsim Development
Nouvelle Kemuning Industrial Park (Phase 2)
Structure Reinforced concrete structure frame
Wall Common Bricks
Roof Metal deck roofing
Ceiling Ground Floor Skim coat
First Floor Skim coat
Second Floor Suspended 2' x 4' Ceiling
Floor Finishes
Ground Floor – cement render
First Floor – cement render
Second Floor – cement render
Toilet Floor Finishes Homogeneous tiles
Staircase Floor Finishes Homogeneous tiles
Wall Finishes Internal – Toilet – homogeneous tiles
– Other areas – plaster & paint
External – Plaster & paint
Windows Aluminium Glazing System
Door Motorised roller shutter
Staircase entrance – fire door/solid door
Toilet – plywood flush doors
Sanitary Fittings Wash basins 6
  Sitting W.C 5
  Squat W.C. 1
Electrical Fittings Incoming power supply 150Amp, 3 Phase
Lighting points 50
Power points 30
Telephone points 5
Gate & Fencing MS Autogate & 1500mm high brickwall
Design Loading
Ground Floor – 5kN/sqm
First Floor – 5kN/sqm
Second Floor – 2.5kN/sqm